• Production Schedule

    Turn Around Time

    Below is the estimated production turnaround time based on product type and number of units. Please review the schedule carefully before submitting a case.

    !
    Attention: The day of receipt of work and the day of dispatch are not counted as production working days.

    Estimated Production Time

    Turnaround time may vary depending on case complexity, volume, and special requests.

    Numbers shown are working days
    Products 1-3 Units 4-8 Units 9-14 Units 15-28 Units
    Fixed PFM and solid casting 3 4 5 6
    Zircon and Full Zircon and E-Max 3 4 5 6
    T1+ Framework + Bite Rim 3 3 4 4
    PFM with attachment and veneer 4 4 5 7
    Removable Wax lineup Standard turnaround 3
    Framework + Teeth set up and completion Standard turnaround 4
    Flex prosthesis Standard turnaround 5
    Model casting with Framework + Teeth set-up Standard turnaround 4
    Model casting with Framework + Teeth set-up and completion Standard turnaround 5
    Combined Dentures T1, T2, composite veneering, model casting and wax set up Standard turnaround 7
    T1, T2, composite veneering, model casting + assembly and finishing Standard turnaround 8
    Combined Dentures with PFM + Model Casting PFM + Model casting with denture try in Standard turnaround 6
    PFM with attachment + Model casting with denture try in Standard turnaround 6
    PFM + Model casting with set-up and completion Standard turnaround 7
    PFM + T1 + T2 + Composite + Model Casting + Denture try in Standard turnaround 7
    PFM + T1 + T2 + Composite + Model Casting + Set-up and Completion Standard turnaround 8
    Turnaround times are estimates and may change depending on case details, shipping time, remake requests, or additional approvals.